Implementation Study of Critical Path on Educational Building Construction Project in East Jakarta Using AON-PDM Method
Keywords:
Activity on Node (AON), Critical Path, Construction Scheduling, Precedence Diagram Method (PDM)Abstract
Construction project scheduling plays a critical role in ensuring project efficiency, particularly for multistory educational buildings with complex work dependencies. This study analyzes the implementation of the Activity on Node Precedence Diagram Method (AON-PDM) on a real construction project located in East Jakarta. The research aims to map out the sequence of project activities, identify the critical path, and evaluate time optimization opportunities. Project data such as activity lists, durations, and precedence relationships were processed using Microsoft Project 2019 to generate a network diagram and determine early start, late start, and total float values. The findings reveal that PDM is highly effective in visualizing interdependencies among activities and detecting tasks on the critical path that must be closely monitored. The application of AON-PDM in this case study resulted in a reduction of the total project duration from 575 to 554 calendar days. This study underscores the importance of precise scheduling techniques for minimizing delay risks and achieving optimal resource allocation in building construction projects.
References
Kerzner, H. Project Management: A Systems Approach to Planning, Scheduling, and Controlling, 13th ed.; Wiley: Hoboken, NJ, USA, 2022.
Larson, E.W.; Gray, C.F. Project Management: The Managerial Process, 8th ed.; McGraw-Hill: New York, NY, USA, 2021.
Othman, I.; Ahmed, A. Critical path analysis and scheduling optimization in building construction projects. Buildings 2021, 11, 421. https://doi.org/10.3390/buildings11100421.
Project Management Institute (PMI). A Guide to the Project Management Body of Knowledge (PMBOK® Guide), 7th ed.; Project Management Institute: Newtown Square, PA, USA, 2021.
Luthan, R.; Syafriandi, R. Evaluation of construction project scheduling using Microsoft Project. J. Tek. Sipil 2021, 8, 45–53.
Upadi, B. Application of PERT-CPM methods in risk-aware scheduling of building projects. Civ. Eng. Archit. 2020, 8, 1293–1301. https://doi.org/10.13189/cea.2020.080615.
Putra, R.; Wijaya, A. Integration of BIM and project scheduling for construction time efficiency. J. Constr. Eng. Manag. 2021, 147, 04021089. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002115.
Siregar, M.; Harahap, D. Application of precedence diagram method in high-rise building scheduling. Int. J. Civ. Eng. Technol. 2021, 12, 45–53.
Rahman, A.; Prasetyo, H. Activity relationship modeling using PDM for construction time optimization. J. Eng. Res. 2022, 10, 115–124.
Handoko, B.; Simatupang, J. Application of network scheduling in complex project planning. J. Tek. Sipil Perenc. 2020, 22, 55–62.
Rizal, M.; Hartono, D. Evaluation of critical path method in public building construction. Int. J. Civ. Eng. Technol. 2020, 11, 65–72.
Fauzan, A.; Sari, T. Effectiveness of Microsoft Project in construction time management. J. Tek. Sipil UNAND 2021, 19, 99–106.
Pratama, Y.; Nugroho, S. Optimization of construction scheduling using network planning techniques. J. Phys. Conf. Ser. 2021, 1811, 012045. https://doi.org/10.1088/1742-6596/1811/1/012045.
Mulyadi, E. Role of software-based scheduling in reducing construction delays. J. Eng. Technol. Sci. 2022, 14, 23–31. https://doi.org/10.5614/j.eng.2022.14.1.3.
Ministry of Public Works and Housing. Standard Project Schedule for Construction Services in Education Buildings. Available online: https://pu.go.id (accessed on 10 July 2025).
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 Structural Insights in Planning and Infrastructure Leadership (SIPIL)

This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.